Solids Processing Complex HVAC Upgrades

Bid Number: 
UB-2023-003
Start / End Dates & Times: 
03/22/2023 - 12:15am to 04/19/2023 - 2:00pm
Bid: Closed
Addendum(s): 

Upper Blackstone Clean Water invites Statements of Qualifications to be received for Solids Processing Complex HVAC Upgrades, at the Upper Blackstone Clean Water Facility at 50 US-20, Millbury, MA 01527 in accordance with the Request for Qualifications, dated March 2023.

The Scope of Work consists of a comprehensive analysis and redesign of the HVAC systems in the Solids Processing Complex (SPC).  The SPC consists of three individual, but connected, buildings; the Incinerator Building, the Dewatering Building and the Thickener Building. Two systems in the SPC are prioritized for replacement: an existing gas-fired boiler (6,495 MBH input, 5,230 MBH output) installed in 1997 and a waste heat recovery system; and three 15-ton self-contained DX ACUs installed in 2004.  The total building floor area is approximately 50,600 sf.

Statements of Qualifications will be received until 2:00 p.m., on Wednesday April 19, 2023. All Statements of Qualifications should be submitted to ddescheneau@ubcleanwater.org and received no later than the date and time specified above.

Subscribe to Updates

The form below must be filled out, as this will ensure you automatically receive any associated addendums. Once completed, you will then be able to view the Bid/RFP.

Business Information

By clicking submit, you are acknowledging that you will receive an email notification with a link back to the website whenever an addendum is posted to this bid.